Reuse field intelligence
Build governed producer and injector packages from field lithology, then copy them into independent well records.
Public alpha now openControlled-planning MVPSynthetic demo portfolio included
Intelligent well delivery · Public alphaDrillium connects field knowledge, deterministic engineering, controlled decisions and Project Controls in one auditable well-delivery environment.
It works through engineering dependencies—not disconnected data-entry sheets—so a change in the well basis can reveal what must be reviewed downstream.
Drillium organizes repeatable field knowledge and well-specific decisions without turning engineering into a static template.
Build governed producer and injector packages from field lithology, then copy them into independent well records.
Make the relationship between formation basis, casing, equipment, section engineering, rig and delivery visible.
Separate calculation, recommendation, review, approval and field verification with durable evidence.
Rendered HTML and responsive engineering graphics show how the controlled workspaces connect. No staged screenshots and no private customer data.
Mud inhibition and exposure time review
Every stage consumes an approved or reviewable upstream basis and produces explicit inputs for what follows.
Governed lithology, pressure windows, water-protection basis and offset trajectories.
Surface coordinates and target entry drive auditable vertical, directional and lateral alternatives.
Formation risks and pressure windows support casing seats, nested strings and liner transitions.
Casing and reservoir purpose shape BOPE, wellhead, completion and permanent surface-stack screening.
Cement, fluids, hydraulics, hole cleaning, BHA, bit and nozzle cases are linked to each section.
Torque-and-drag, equipment envelopes, rig capability, duration and preliminary daily cost are screened.
Structured engineering evidence becomes a reviewable drilling program, schedule, risk and readiness package.
Construction, field execution, completions and production handover follow the approved basis and changes.
Versioned lithology, source permissions, equipment catalogs and immutable calculation evidence.
Upstream changes identify affected downstream designs instead of leaving disconnected cells behind.
Trajectory, casing, cement, fluids, BHA, hydraulics, torque-and-drag and rig screening.
Human recommendations, independent review, approval gates, overrides and change evidence.
WBS, dependencies, CPM schedules, baselines, readiness, risks, materials and cost foundations.
Responsive trajectory, BHA, completion and surface-stack views for review and communication.
Controlled drilling-program assembly with supervisor-ready PDF, XLSX and CSV outputs.
Responsive access across phone, tablet, control room and 4K engineering workstations.
Drillium supports the handoff without blurring who recommends, approves, executes and reports.
Owns the well design and drilling program, coordinates stakeholders, manages technical change and records well-level vendor recommendations.
Enforces the approved program in the field, controls quality and readiness, manages daily work and reports progress, risk and deviation.
Lithology-led planning, core design engines, governed catalogs, program assembly, exports and Project Controls foundations.
CompletedGoverned selection gates, dependency and recalculation controls, approved-program offline access and full release QA.
Alpha releaseAdvanced cost/AFE, field construction, live well execution, completion/workover, collaboration and controlled AI assistance.
Planned next31 October 2026 is a development target, not a public release date or contractual delivery commitment.
Future network capabilities are being researched in trust-first order. They are not available product routes and have no committed release date.
Discover equipment and services by region, capability and support level.
Authenticated Q&A, evidence-backed knowledge sharing and product voting.
Internal transfer and external RFQ for available equipment and materials.
Planned research with no committed release date. Vendor listings, marketplace evidence, community reputation and user content will not constitute supplier approval, equipment certification, engineering approval or field instruction.
Pricing begins when commercial access opens. During public alpha, registration collects no card details and does not start your trial.
Introductory alpha pricing until 31 December 2026. Standard rates resume for billing periods beginning after that date.
Yes. The read-only public alpha is open without an account. Verified editable sandboxes open separately after the production email-delivery gate passes. Billing remains disabled.
No. Drillium is designed around governed dependencies: field and well inputs create traceable impacts across trajectory, casing, equipment, section engineering, rig screening, program assembly and delivery planning.
The first release is designed for operator drilling teams, including drilling engineering, well engineering, geology, reservoir, HSE, Project Controls, cost, review and field supervision roles.
No. Calculations and suggestions remain engineering support. Defaults are reviewable, overrides are explicit, and approval remains with competent authorized people.
When commercial access opens, an organization can begin one 14-day trial through Stripe. A payment method will be collected, and active seats will convert to the selected plan unless the subscription is cancelled before the trial ends.
We store only your email and consent evidence so Petromium can send launch and early-access updates. Joining does not open an account, start a trial or collect payment details.
Join the launch list for post-MVP milestones and future access invitations. We collect only your email and consent evidence.