Petromium Tools / Formula set CMT-VOL-001

Cementing Volume & Displacement

Single-stage primary placement · browser-only workspace· V2.0

Stack
Job
Units
Stored only in this browser · tap any field unit for quick conversion

Calculated reference

Placement path · surface casing

Cement placement column

surface casing · interfaces shown in true vertical order

01,0002,0003,000MD (ft)SURFACETD 3,000 ftCEMENT HEADCASINGSHOE 3,000 ftLEADLEADTAILTAILDISPLACEMENTTOP OF CEMENTCASEDSANDLIMEEXCESS IS APPLIED BY ANNULAR SECTION · INTERFACES ARE VOLUME-SCALED

Placement sequence

Cumulative pumped volume versus leading interface depth

0204.1408.2612.3816.41,020.506001,2001,8002,4003,000Cumulative pumped volume (bbl)Interface MD (ft)DISPLACEMENT 457 bbl · 4,080 STROKES · TOTAL 1,020.5 bblPreflushSpacerTailLead

Lead volume

371.166 bbl

Tail volume

192.385 bbl

Displacement

456.977 bbl

Pump strokes

4,080 strokes

Total pumped

1,020.528 bbl

Review - not an approval

Material snapshot

Lead exact

1,310.655 sk

Lead selected

1,311 sk selected

Tail exact

939.271 sk

Tail selected

940 sk selected

LeadTail

Exact and selected sack quantities remain separate. The selected rule is a display option, not a procurement or mixing instruction.

Worksheet sections

Declared scope

Single-stage primary casing, liner, or inner-string cementing. No multistage or reverse-circulation model.

Job basis

Declared calculation scope
Conventional single-stage primary casing; no multistage, reverse, squeeze, plug, transient hydraulics, or real-time control.
Interval order is target top of cement to shoe. Tail slurry is allocated from the shoe upward. Each interval may use geometric capacity or a measured/caliper override with its source note.

Calculation complete

Calculation audit

0 warnings

Lead slurry

371.166 bbl

Tail slurry

192.385 bbl

Shoe track

6.802 bbl

Displacement

456.977 bbl

Lead sacks

1,311 sk

Tail sacks

940 sk

Calculation observations

CALCULATED_DISPLACEMENT_REFERENCE

Calculated displacement is a reference, not permission to continue pumping if expected plug or pressure indications are absent.

Operational use warning: This worksheet supports - and does not replace - the approved cementing program, service-company simulation, verified job volumes, current rig procedure, and competent-person review.CMT-VOL-001 v1.0.0

Reference example loaded - replace every value with verified job data.