Petromium Tools / Formula set MUD-WD-001

Mud Weighting & Dilution

Four explicit material-balance modes · browser-only workspace· V2.0

Context
Units
Stored only in this browser · tap any field unit for quick conversion

Calculated process

Weight up · surface context

Active-system mass balance

weight up · graduated process volume

ControlledMUD-WD-001 v1.0.0
Graduated active pit showing initial volume, additions, final level, and discard volume.Barite 4.2 SG123 bbl98 bbl74 bbl49 bbl25 bbl0 bblINITIAL 100FINAL 109.5ACTIVE PIT1214 ppgMWADDITION 9.5 bbl · DISCARD 0 bbl
Figure data
Mass balance quantities behind the figure
QuantityValue
Modeweight up
Weighting materialBarite 4.2 SG
DiluentFresh water
Addition volume9.524
Discard volume0

Density response

Resulting mud weight versus material addition

ControlledMUD-WD-001 v1.0.0
Calculated density response curve with initial, target, and selected operating points.TARGET 14 ppgSELECTED · 140 sacks · 14,000 lb · ΔV 9.5 bblCalculated responseTarget
Figure data
Treatment stages behind the density-response figure
StageFractionCumulative additionCumulative discardSystem volumeDensity
10.21.90101.912.43
20.43.810103.8112.844
30.65.710105.7113.243
40.87.620107.6213.628
519.520109.5214

Addition

9.524 bbl

Discard

0 bbl

Final volume

109.524 bbl

Final density

14 ppg

Review stages

5 stages

Review · not an approval

Treatment snapshot

Material mass

14,000 lb

Exact sacks

140 sk

Selected display

140 sk

Volume increase

9.524 bbl

Exact and rounded quantities remain separate. Presets are editable defaults. No result authorizes material transfer, dumping, pumping, or discharge.

Calculation modes

Declared mode

Add dry material; active volume increases.

Dry weighting material

Weight up

The target and treatment method are user inputs. The tool reports a static material balance and does not prescribe a mud program.

Weighting material · editable after preset

Calculation complete

Calculation audit

0 warnings

Addition

9.524 bbl

Final volume

109.524 bbl

Discard

0 bbl

Final density

14 ppg

Calculation observations

MATERIAL_PROPERTY_ASSUMPTION

The calculation uses the entered absolute material density and additive volumes. Verify supplier properties, purity, moisture, transfer loss, and actual yield.

VERIFY_CONDITIONED_DENSITY

Mix and condition under the approved mud program, then verify a representative sample with calibrated field equipment. The worksheet does not authorize a treatment or target.

Operational use warning: calculation support only. Follow the approved mud program; verify target, material properties, inventory, pit capacity, fluid chemistry, conditioning, and representative density measurements.
MUD-WD-001 v1.0.0 · source-traceable static material balanceBarite reference example loaded - replace every value with verified job data.