Petromium Tools / Formula set WC-VERT-001

Well-Control Kill Sheet

Vertical well · conventional circulation · browser-only workspace· V2.0

Stack
Method
Units
Stored only in this browser · tap any field unit for quick conversion

Wait & Weight

Circulation path · surface stack

Vertical well-control schematic

surface stack · bit on bottom

ControlledWC-VERT-001 v1.0.0
MUD PUMPSBOPCHOKESICP 1,000 psi30 spm · 0.102 bbl/stkSHOE 5,000 ftKILLBIT 10,000 ftON BOTTOMFlow down drillpipeFlow through bit and up annulusINFLUX20 bblKILL MUD12.962 ppgSIDPP500 psiICP / FCP1,200 / 756 psiMAASP1,450 psi
Figure data
Well geometry and shut-in readings behind the schematic
QuantityValue
Bit TVD (ft)10,000
Hole TVD (ft)10,000
Shoe TVD (ft)5,000
SIDPP (psi)500
SICP (psi)1,000
Pit gain (bbl)20
Selected MAASP (psi)1,450
Kill mud weight (ppg)12.96

Pressure schedule

Circulating pressure against cumulative strokes · Wait and Weight

ControlledWC-VERT-001 v1.0.0

Compact pressure schedule

1,200

ICP · psi

756

FCP · psi

3,529

Strokes to bit

5,588

Bottoms up

Figure data
Circulating-pressure schedule behind the figure
StepStrokesTarget pressure (psi)
Surface01,200
10%3531,156
20%7061,111
30%1,0591,067
40%1,4121,022
50%1,765978
60%2,118934
70%2,471889
80%2,824845
90%3,176800
Kill fluid at bit3,529756

SCR pressure

700 psi

ICP

1,200 psi

FCP

756.09 psi

To bit

3,529 strokes

Bottoms up

5,588 strokes

Review - not an approval

Annular pressure limits

SICP

1,000 psi

Selected MAASP

1,450 psi

Static margin

450 psi

SICPSelected MAASP

Static comparison only. The tool does not predict maximum dynamic casing pressure or prescribe a choke action.

Worksheet sections

Declared scope

Vertical well, conventional circulation. No MPD, bullheading, volumetric, lubricate-and-bleed, or deviated-well schedule.

Pre-recorded data

Calculation complete

Calculation audit

0 warnings

Planned kill mud weight

12.962 ppg

ICP

1,200 psi

FCP

756.09 psi

Formation pressure

6,740 psi

Total strokes

9,118 strokes

Calculation observations

No engine flags. This is not an operational approval; independent verification remains required.

Operational use warning: This worksheet supports - and does not replace - the approved well-control program, current rig procedures, barrier verification, and competent-person review. Independently verify every input before action.

WC-VERT-001 v1.0.0
Example values loaded - replace every value with verified rig data.